BOP 8 Pipe Rack work by PT Tohoma Mandiri on the IKK Pindo 4 Karawang Project
BOP 8 Pipe Rack work by PT Tohoma Mandiri on the IKK Pindo 4 Karawang
PT Tohoma Mandiri - Assembling Innovation
The work progress on the 20.000m3 DC Cilincing GFS tank at SPAM Regional I Jatiluhur DKI Jakarta is entering the stage of installing the roof and layer 1 of the tank body, followed by preparations for lifting layer 2 of the tank body.
The Glass Fused Steel Tank DC Cilincing reservoir tank project is the largest water storage tank project in all of Indonesia which can later function and be used for the needs of the Jatiluhur I DKI Jakarta Regional SPAM project.
This project was carried out by our professional team in their field, so we can guarantee the quality and timeliness of the work.
BOP 8 Pipe Rack work by PT Tohoma Mandiri on the IKK Pindo 4 Karawang
IKK Toba Pipeline and SPAM Building Development Project by PT Tohoma Mandiri The construction of
ITB Student Visit to the Location of Jakarta Sewerage Development Project Students from the Bandung
© 2023 Tohoma | All Rights Reserved