PT Tohoma Mandiri - Assembling Innovation
JACKING METHOD
Jacking Method
DIAMETER 1000 – 1200
The Jacking method with the MTBM System is a fast, remotely controlled excavation method in the ground to avoid high risks for the operator and simultaneously maintainpotentially unstable soil conditions.
Soil excavation is carried out from the control room.
T : +62 21 2270 8888
F : +62 21 2270 8999
18 Office Park 15th Floor, Unit G, Jl.T.B. Simatupang No.18 Jakarta Selatan 12520, Indonesia
General: info@tohoma.co.id
Sales: sales@tohoma.co.id
© 2023 Tohoma | All Rights Reserved