BOP 8 Pipe Rack work by PT Tohoma Mandiri on the IKK Pindo 4 Karawang Project
BOP 8 Pipe Rack work by PT Tohoma Mandiri on the IKK Pindo 4 Karawang
PT Tohoma Mandiri - Assembling Innovation
PT Tohoma Mandiri became one of the sub-contractors in the Makassar B1 Waste Water Treatment Installation Project, the Makassar City Main Wastewater Channel Work Package. This project has been running with PT. PP (Housing Development) – Memiontec (KSO) as Main Contractor.
The scope of our work is to install wastewater treatment using the microtunneling jacking method, which began with the installation of the first DN1000mm pipe on July 6, 2023. Together with a team that is professional and experienced in their field, PT Tohoma Mandiri is committed to prioritizing occupational health and safety, and ensuring that the projects we work on are carried out optimally so as to achieve the best results.
BOP 8 Pipe Rack work by PT Tohoma Mandiri on the IKK Pindo 4 Karawang
IKK Toba Pipeline and SPAM Building Development Project by PT Tohoma Mandiri The construction of
ITB Student Visit to the Location of Jakarta Sewerage Development Project Students from the Bandung