20,000m3 DC Cilincing GFST Reservoir Tank Work at SPAM Regional Jatiluhur I DKI Jakarta by PT Tohoma Mandiri
20,000m3 DC Cilincing GFST Reservoir Tank Work at SPAM Regional Jatiluhur I DKI Jakarta by
PT Tohoma Mandiri - Assembling Innovation
PT Tohoma Mandiri succeeded in making a breakthrough on the Makassar B1 Wastewater Treatment Plant Project, Makassar City Main Wastewater Channel Work Package. The length of the span that we succeeded in working from the Departure Inlet Chamber to Arrival MH10347 was 87.48 meters using the jacking method.
This project has been running with PT. PP (Housing Development) – Memiontec (KSO) as Main Contractor, and PT Tohoma Mandiri as Sub Contractor for the DN1000mm microtunneling work. With the support of a team that is skilled and experienced in their field, PT Tohoma Mandiri is determined to make occupational health and safety a top priority, while ensuring that every project we carry out is carried out with full dedication to achieve optimal results.
20,000m3 DC Cilincing GFST Reservoir Tank Work at SPAM Regional Jatiluhur I DKI Jakarta by
Jacking Auger Work by PT Tohoma Mandiri on the Waste Water Treatment Plant Project in
PT Tohoma Mandiri 20,000m3 GFST Reservoir Tank at the DKI Jakarta Jatiluhur Regional SPAM Project