BOP 8 Pipe Rack work by PT Tohoma Mandiri on the IKK Pindo 4 Karawang Project
BOP 8 Pipe Rack work by PT Tohoma Mandiri on the IKK Pindo 4 Karawang
PT Tohoma Mandiri - Assembling Innovation
PT Tohoma Mandiri is responsible for the installation of the Glass Fused Steel Tank (GFST) vol. 3500 m3 which is part of the Integrated Work for the Construction of the Bango 200 lps Water Treatment Plant (IPA) in Malang City. This project aims to increase community access to clean and quality drinking water.
The GFS tank with a diameter of 32 m and a height of 4.8 m functions as the main reservoir for drinking water which will be distributed to the community. Tank installation is carried out using the latest technology and methods to ensure long-term durability and efficiency.
PT Tohoma Mandiri continues to strive to provide infrastructure that supports the basic needs of society, especially in providing quality drinking water. With extensive experience and a team of professional experts, PT Tohoma Mandiri continues to strive to make a positive contribution to infrastructure development.
BOP 8 Pipe Rack work by PT Tohoma Mandiri on the IKK Pindo 4 Karawang
IKK Toba Pipeline and SPAM Building Development Project by PT Tohoma Mandiri The construction of
ITB Student Visit to the Location of Jakarta Sewerage Development Project Students from the Bandung
© 2023 Tohoma | All Rights Reserved