The Role of Hydraulic Jacks in Microtunneling Projects for Success and Efficiency
The Role of Hydraulic Jacks in Microtunneling Projects for Success and Efficiency Hydraulic Jack functions
PT Tohoma Mandiri - Assembling Innovation
The IKK (Indah Kiat Karawang) Pindo 4 Karawang project is one of the major steps in the development of the paper and pulp industry in Indonesia. This project aims to establish a new production facility that supports the needs of the industry on a large scale.
In this project, PT Tohoma Mandiri is responsible for the work of Electrical, Instrument, and Automation projects. Details of the work such as the installation of cable trays and cable ladders in the Pipe Rack area and other buildings. The obstacles during the project include weather changes. The project is targeted to be completed in 6 months with a focus on timeliness and technical specifications.
By implementing strict quality control in every stage of installation to ensure compliance with project specification standards. Our commitment to optimal results through the application of the latest technology and structured projects continues to be carried out with maximum effort at every stage of work.
The Role of Hydraulic Jacks in Microtunneling Projects for Success and Efficiency Hydraulic Jack functions
Jakarta Sewerage Development Project Officialy Started, Microtunneling Ready to Support DKI Jakarta Sanitation System Jakarta
GFST Reservoir Tank in Integrated Work for the Installation of Water Treatment Plants in Malang