
Tohoma GFS Tank Installation at ELB ADD ON CCPP 39 MW PROJECT PLANT 10 MW
Tohoma GFS Tank Installation at ELB ADD ON CCPP 39 MW PROJECT PLANT 10 MW
PT Tohoma Mandiri - Assembling Innovation
PT Tohoma Mandiri has completed work on the P18AS project with the scope of tunnel construction work which will function as a gas pipe repair room. The dimensions of the tunnel that has been worked on include 6 meters, 1.8 meters wide and 2.5 meters high.
The project uses the innovative Pipe Jacking Microtunneling method, enabling tunnel construction with high precision and minimal environmental impact. In addition, this project is significant in the maintenance and repair of gas pipelines in the region. The success of this project confirms that our expertise and commitment to high quality will provide a strong foundation for future projects using innovative technologies.
Tohoma GFS Tank Installation at ELB ADD ON CCPP 39 MW PROJECT PLANT 10 MW
PT Tohoma Mandiri Kembali Sukses Breakthrough di Proyek JSDP Zona 1 Paket 2 Yes, it’s
Inovasi Elektrikal, Mekanikal, dan Piping oleh PT Tohoma Mandiri di Proyek OKI Pulp dan Paper
© 2023 Tohoma | All Rights Reserved