BOP 8 Pipe Rack work by PT Tohoma Mandiri on the IKK Pindo 4 Karawang Project
BOP 8 Pipe Rack work by PT Tohoma Mandiri on the IKK Pindo 4 Karawang
PT Tohoma Mandiri - Assembling Innovation
PT Tohoma Mandiri are the main distributor of GFS Tank / Enamel Tanks throughout Indonesia. The installation project for the 2 unit 1.500 m3 GFS Tank in the Medan Industrial Area has started with initial preparations including making the foundation, continued to erection and installing the partition.
Installing a GFS Tank generally takes about 3-4 weeks, depending on the size of the tank being worked on. The work is carried out by a professional team who are experts in their field, so we can guarantee the quality and the right time of work.
The quality and durability of Glass Fused Steel Tank products and accessories are always been our priority, even in the most extreme conditions. The GFST Tank project is expected to be completed by the end of May 2023.
BOP 8 Pipe Rack work by PT Tohoma Mandiri on the IKK Pindo 4 Karawang
IKK Toba Pipeline and SPAM Building Development Project by PT Tohoma Mandiri The construction of
ITB Student Visit to the Location of Jakarta Sewerage Development Project Students from the Bandung
© 2023 Tohoma | All Rights Reserved