PT Tohoma Mandiri are the main distributor of GFS Tank / Enamel Tanks throughout Indonesia. The installation project for the 2 unit 1.500 m3 GFS Tank in the Medan Industrial Area has started with initial preparations including making the foundation, continued to erection and installing the partition.
Installing a GFS Tank generally takes about 3-4 weeks, depending on the size of the tank being worked on. The work is carried out by a professional team who are experts in their field, so we can guarantee the quality and the right time of work.
The quality and durability of Glass Fused Steel Tank products and accessories are always been our priority, even in the most extreme conditions. The GFST Tank project is expected to be completed by the end of May 2023.
GFST Reservoir Tank Vol. 300m3 by PT Tohoma Mandiri at SPAM Lotu, North Nias Regency
Why is it Necessary to Implement K3 in Construction Projects? In every construction project, workers
PT Tohoma Mandiri which excels in Electrical Solutions Electrical engineering applications involve various sciences such
© 2023 Tohoma | All Rights Reserved