PT. Tohoma Mandiri has finished working on the Waste Water Treatment Plant (WWTP) Installation at the Palembang City Sewerage Project. This project has been completed with PT. McConnell Dawell Indonesia and PT. PP (Pembangunan Perumahan) as Main Contractor.
As one of the sub-contractors in the Palembang WWTP project, our scope of work includes mechanical, piping, BTF Tank, and Clarifier work. In addition, we also carried out installations in the SWPS (Site Waste Pump Station) area, SDB (Sludge Drying Bed) as well as other items such as DICL and Oudoor Control Facility.
We always prioritize occupational health and safety, and ensure that the projects we work on are carried out optimally because they are carried out by our team of professionals in this field so as to achieve the best results.
Hold Fire Management Training to Improve Work Safety on Projects PT Tohoma Mandiri once again
GFST Reservoir Tank Vol. 300m3 by PT Tohoma Mandiri at SPAM Lotu, North Nias Regency
Why is it Necessary to Implement K3 in Construction Projects? In every construction project, workers
© 2023 Tohoma | All Rights Reserved