Embedded Pipe Installation Project at WWTP JSDP Pluit Zone 1
Embedded Pipe Installation Project at WWTP JSDP Pluit Zone 1 The installation of Embedded Pipe
PT Tohoma Mandiri - Assembling Innovation
PT Tohoma Mandiri was selected as a sub-contractor in the Zone 1 and 3 Waste Water Treatment Plant project in the East Kalimantan Nusantara Capital Area with PT Wika – Hutama, KSO as the Main Contractor.
The waste water pipe installation work using the Jacking Auger Diameter 200 method has several challenges that need to be faced, including hard ground conditions, especially rocks in the form of shale mudstone. This condition has an impact on the daily productivity level of pipe installation.
However, with cooperation between professional and experienced teams, this challenge will be overcome well and always prioritize work health and safety so as to achieve optimal results.
Embedded Pipe Installation Project at WWTP JSDP Pluit Zone 1 The installation of Embedded Pipe
Tohoma GFS Tank Installation at ELB ADD ON CCPP 39 MW PROJECT PLANT 10 MW