GFST Reservoir Tank Vol. 300m3 by PT Tohoma Mandiri at SPAM Lotu, North Nias Regency
GFST Reservoir Tank Vol. 300m3 by PT Tohoma Mandiri at SPAM Lotu, North Nias Regency
PT Tohoma Mandiri - Assembling Innovation
PT Tohoma Mandiri was selected as a sub-contractor in the Zone 1 and 3 Waste Water Treatment Plant project in the East Kalimantan Nusantara Capital Area with PT Wika – Hutama, KSO as the Main Contractor.
The waste water pipe installation work using the Jacking Auger Diameter 200 method has several challenges that need to be faced, including hard ground conditions, especially rocks in the form of shale mudstone. This condition has an impact on the daily productivity level of pipe installation.
However, with cooperation between professional and experienced teams, this challenge will be overcome well and always prioritize work health and safety so as to achieve optimal results.
GFST Reservoir Tank Vol. 300m3 by PT Tohoma Mandiri at SPAM Lotu, North Nias Regency
Why is it Necessary to Implement K3 in Construction Projects? In every construction project, workers
PT Tohoma Mandiri which excels in Electrical Solutions Electrical engineering applications involve various sciences such
© 2023 Tohoma | All Rights Reserved