We have Succesfully Completed Jacking Pipe at the IPAL (Wastewater Treatment) Palembang Work with 104.910 span length
We have Succesfully Completed Jacking Pipe at the IPAL (Wastewater Treatment) Palembang Work with 104.910 span length The microtunneling work