
Tips for Using Tunnel Gel to Achieve Optimal Performance in Construction Work
Tips for Using Tunnel Gel to Achieve Optimal Performance in Construction Work In construction, particularly
PT Tohoma Mandiri - Assembling Innovation
Yes, it’s breakthrough! The JSDP or Jakarta Sewerage Development Project Zone 1 Package 2 successfully breakthrough MTBM Pit MH C-1.3 to C-1.2 with a span length of 99.6 meters at the strategic point of Sutan Syahrir Street, Central Jakarta, DKI Jakarta.
Not just an ordinary project, this project involved the Microtunneling method with a diameter of 450mm. In the process, the team also faced challenging terrain in the form of a combination of sticky clay and silty clay, a type of soil that is often challenging in the drilling process due to its sticky nature.
Thanks to the cooperation of a competent and experienced team and the support of all parties, the PT Tohoma Mandiri Team has successfully overcome the existing challenges and completed the breakthrough according to the target with zero accidents. In addition, our team also strives for continuous improvement for optimal results.
Tips for Using Tunnel Gel to Achieve Optimal Performance in Construction Work In construction, particularly
Corporate Social Responsibility Activities by PT Tohoma Mandiri on Mother’s Day On December 22, 2024,
BOP 8 Pipe Rack work by PT Tohoma Mandiri on the IKK Pindo 4 Karawang
© 2023 Tohoma | All Rights Reserved