PT Tohoma Mandiri which excels in Electrical Solutions
PT Tohoma Mandiri which excels in Electrical Solutions Electrical engineering applications involve various sciences such
PT Tohoma Mandiri - Assembling Innovation
PT Tohoma Mandiri succeeded in making a breakthrough on the Makassar B1 Wastewater Treatment Plant Project, Makassar City Main Wastewater Channel Work Package. The length of the span that we succeeded in working from the Departure Inlet Chamber to Arrival MH10347 was 87.48 meters using the jacking method.
This project has been running with PT. PP (Housing Development) – Memiontec (KSO) as Main Contractor, and PT Tohoma Mandiri as Sub Contractor for the DN1000mm microtunneling work. With the support of a team that is skilled and experienced in their field, PT Tohoma Mandiri is determined to make occupational health and safety a top priority, while ensuring that every project we carry out is carried out with full dedication to achieve optimal results.
PT Tohoma Mandiri which excels in Electrical Solutions Electrical engineering applications involve various sciences such
How Important is Bentonite for Construction Projects Bentonite is a natural clay with a fine
PT Tohoma Mandiri Implements Latest Innovation in Microtunneling Jacking Method In the midst of rapid
© 2023 Tohoma | All Rights Reserved