
Optimization of Clean Water Infrastructure in Southwest Papua by PT Tohoma Mandiri
Optimization of Clean Water Infrastructure in Southwest Papua by PT Tohoma Mandiri PT Tohoma Mandiri
PT Tohoma Mandiri - Assembling Innovation
The breakthrough achieved by PT Tohoma Mandiri in the national strategic project in the Indonesian Capital City (IKN) of East Kalimantan through the Jacking Auger work for Wastewater Zone 1 and Zone 3 with a diameter of DN200 mm at several points including MH.0144-MH.0145, MH.1262-MH.1261, MH.1263-MH.1261 which was completed in stages and on time.
Next, PT Tohoma Mandiri will continue work on other points in the pipe jacking project in Zones 1 and 3, with a target completion date of the late-set schedule. Each span has strict deviation tolerances, so the team uses an elevation monitoring system and laser targets to ensure the pipeline remains precisely aligned with the design.
PT Tohoma Mandiri will continue to work on the next span in the Zone 1 and Zone 3 jacking pipe network, and fully support the development of integrated sanitation infrastructure in the Indonesian Capital City area.
Optimization of Clean Water Infrastructure in Southwest Papua by PT Tohoma Mandiri PT Tohoma Mandiri
Smart Construction Technology Innovation with PT Tohoma Mandiri In this modern era, efficiency and sustainability
Tips for Using Tunnel Gel to Achieve Optimal Performance in Construction Work In construction, particularly
© 2023 Tohoma | All Rights Reserved