Top

PT Tohoma Mandiri - Assembling Innovation

PT Tohoma Mandiri's success in the Palembang B2B IPAL Project

The Palembang City B2B WWTP project was built with the aim of reducing waste water pollution while improving the health quality of Palembang City residents. PT Tohoma Mandiri as one of the sub-contractors for this project also succeeded in completing the scope of work with a final span of 81m using the DN1000 jacking pipe method.

Despite of the challenges that exist, we always prioritize work health and safety, and ensure that the project we work on the carried out optimally by our professionals team in this field so as to achieve the best results. This reflects PT Tohoma Mandiri’s commitment to quality results and good perfomance.