
Tips for Using Tunnel Gel to Achieve Optimal Performance in Construction Work
Tips for Using Tunnel Gel to Achieve Optimal Performance in Construction Work In construction, particularly
PT Tohoma Mandiri - Assembling Innovation
The Palembang City B2B WWTP project was built with the aim of reducing waste water pollution while improving the health quality of Palembang City residents. PT Tohoma Mandiri as one of the sub-contractors for this project also succeeded in completing the scope of work with a final span of 81m using the DN1000 jacking pipe method.
Despite of the challenges that exist, we always prioritize work health and safety, and ensure that the project we work on the carried out optimally by our professionals team in this field so as to achieve the best results. This reflects PT Tohoma Mandiri’s commitment to quality results and good perfomance.
Tips for Using Tunnel Gel to Achieve Optimal Performance in Construction Work In construction, particularly
Corporate Social Responsibility Activities by PT Tohoma Mandiri on Mother’s Day On December 22, 2024,
BOP 8 Pipe Rack work by PT Tohoma Mandiri on the IKK Pindo 4 Karawang
© 2023 Tohoma | All Rights Reserved