Hydraulic Jack functions is tasked with pushing precast pipes into the drill hole simultaneously during the drilling process. When the Microtunneling Boring Machine (MTBM) machine is drilling the ground, the hydraulic jack simultaneously pushes the pipe from behind the drilling machine. The pipe automatically follows the drilling pace without pause.
The advantage of using a hydraulic jack in installing pipes is the efficiency of time and energy, because the pipe installation takes place along with the drilling process. If the drilling is complete, the pipe installation is also complete.
Hydraulic jacks are also used in PT Tohoma Mandiri’s microtunneling projects. This technology ensures that pipe installation is more efficient, fast, and precise, along with soil drilling carried out by the Microtunnel Boring Machine (MTBM).
Tohoma GFS Tank Installation at ELB ADD ON CCPP 39 MW PROJECT PLANT 10 MW
PT Tohoma Mandiri Kembali Sukses Breakthrough di Proyek JSDP Zona 1 Paket 2 Yes, it’s
Inovasi Elektrikal, Mekanikal, dan Piping oleh PT Tohoma Mandiri di Proyek OKI Pulp dan Paper
© 2023 Tohoma | All Rights Reserved