
Optimization of Clean Water Infrastructure in Southwest Papua by PT Tohoma Mandiri
Optimization of Clean Water Infrastructure in Southwest Papua by PT Tohoma Mandiri PT Tohoma Mandiri
PT Tohoma Mandiri - Assembling Innovation
Tohoma GFST Tank Installation at the ELB ADD ON CCPP 39 MW Project Power Plant 10 MW is currently being carried out by the PT Tohoma Mandiri team. This project aims to increase power supply capacity to support the growing industrial sector in Batam City, which requires greater energy resources.
PT Tohoma Mandiri work scope is the installation of 2 tank units with a capacity of 300 m3 for demineralised water tanks and 50 m3 for service water tanks. With a focus on timely completion and ensuring smooth operation of the power plant, the work has now entered the install lettering service tank stage.
With the experience and expertise of the PT Tohoma Mandiri team, we are committed to delivering the best results and ensuring the project runs smoothly. Stay tuned for our project updates.
Optimization of Clean Water Infrastructure in Southwest Papua by PT Tohoma Mandiri PT Tohoma Mandiri
Smart Construction Technology Innovation with PT Tohoma Mandiri In this modern era, efficiency and sustainability
Tips for Using Tunnel Gel to Achieve Optimal Performance in Construction Work In construction, particularly
© 2023 Tohoma | All Rights Reserved