The Role of Hydraulic Jacks in Microtunneling Projects for Success and Efficiency
The Role of Hydraulic Jacks in Microtunneling Projects for Success and Efficiency Hydraulic Jack functions
PT Tohoma Mandiri - Assembling Innovation
PT Tohoma Mandiri became one of the sub-contractors in the Makassar B1 Waste Water Treatment Installation Project, the Makassar City Main Wastewater Channel Work Package. This project has been running with PT. PP (Housing Development) – Memiontec (KSO) as Main Contractor.
The scope of our work is to install wastewater treatment using the microtunneling jacking method, which began with the installation of the first DN1000mm pipe on July 6, 2023. Together with a team that is professional and experienced in their field, PT Tohoma Mandiri is committed to prioritizing occupational health and safety, and ensuring that the projects we work on are carried out optimally so as to achieve the best results.
The Role of Hydraulic Jacks in Microtunneling Projects for Success and Efficiency Hydraulic Jack functions
Jakarta Sewerage Development Project Officialy Started, Microtunneling Ready to Support DKI Jakarta Sanitation System Jakarta
GFST Reservoir Tank in Integrated Work for the Installation of Water Treatment Plants in Malang
© 2023 Tohoma | All Rights Reserved