PT Tohoma Mandiri became one of the sub-contractors in the Makassar B1 Waste Water Treatment Installation Project, the Makassar City Main Wastewater Channel Work Package. This project has been running with PT. PP (Housing Development) – Memiontec (KSO) as Main Contractor.
The scope of our work is to install wastewater treatment using the microtunneling jacking method, which began with the installation of the first DN1000mm pipe on July 6, 2023. Together with a team that is professional and experienced in their field, PT Tohoma Mandiri is committed to prioritizing occupational health and safety, and ensuring that the projects we work on are carried out optimally so as to achieve the best results.
GFST Reservoir Tank in Integrated Work for the Installation of Water Treatment Plants in Malang
EIA Installation and Service Project for TCCA & H202 by PT Tohoma Mandiri PT Tohoma
Breakthrough on the IPAL Piping Project Zone 1&3 KIPP IKN East Kalimantan by PT Tohoma
© 2023 Tohoma | All Rights Reserved