Embedded Pipe Installation Project at WWTP JSDP Pluit Zone 1
Embedded Pipe Installation Project at WWTP JSDP Pluit Zone 1 The installation of Embedded Pipe
PT Tohoma Mandiri - Assembling Innovation
Microtunneling or the process of building tunnels using a drilling machine (Microtunnel Boring Machines, MTBM) combined with jacking pipe techniques to install pipes underground in one driving. This process is carried out with the aim of avoiding open excavation.
In other methods, it often causes congestion because it requires diverting traffic lanes. However, Microtunneling operates underground and does not disrupt with traffic areas, so it does not cause congestion or noise problems. By involving the use of a remote controlled drilling machine, Mictotunneling does not require large trenches or open pits there by helping to maintain vegetation around the project area.
From the factors described above, the microtunneling jacking method is the right solution for projects in areas with dense population and traffic. PT Tohoma Mandiri has a team of professionals who are experts in the field of microtunneling, with extensive experience and expertise. Get the best work with us as a reliable partner in efficient microtunneling solutions to meet your project needs.
Embedded Pipe Installation Project at WWTP JSDP Pluit Zone 1 The installation of Embedded Pipe
Tohoma GFS Tank Installation at ELB ADD ON CCPP 39 MW PROJECT PLANT 10 MW
PT Tohoma Mandiri Kembali Sukses Breakthrough di Proyek JSDP Zona 1 Paket 2 Yes, it’s