GFST Reservoir Tank in Integrated Work for the Installation of Water Treatment Plants in Malang City
GFST Reservoir Tank in Integrated Work for the Installation of Water Treatment Plants in Malang
PT Tohoma Mandiri - Assembling Innovation
Jakarta Sewerage Development Project (JDSP) Zone 1 Package 2 officially starts with an opening ceremony held at Jalan Sutan Syahrir no 16, Project JSS pit C.1.1. Attended by a number of agencies such as the PUPR Service, Kumagai Wika Jakon, and several project consultants.
Representative of the Ministry of Public Works and Public Housing (PUPR), Aini, said that this project is a positive step in developing infrastructure with efficient microtunneling technology, which is expected to improve the drainage and sanitation system in Jakarta and provide long-term benefits.
PT Tohoma Mandiri is trusted with Kumagai Wika Jakon to carry out a microtunneling project in 2 packages with a span length of 8.2 kilometers. The work began with the first span in pit C.1.1 with a length of 90 meters. The event was closed with an accompaniment of hope and prayer that this project can run well for optimal results.
GFST Reservoir Tank in Integrated Work for the Installation of Water Treatment Plants in Malang
EIA Installation and Service Project for TCCA & H202 by PT Tohoma Mandiri PT Tohoma
Breakthrough on the IPAL Piping Project Zone 1&3 KIPP IKN East Kalimantan by PT Tohoma
© 2023 Tohoma | All Rights Reserved