IKK Toba Pipeline and SPAM Building Development Project by PT Tohoma Mandiri
IKK Toba Pipeline and SPAM Building Development Project by PT Tohoma Mandiri The construction of
PT Tohoma Mandiri - Assembling Innovation
Students from the Bandung Institute of Technology (ITB) visited the Sewerage Development Project site which is currently being carried out by PT Tohoma Mandiri. This visit aims to provide direct insight into the Microtunneling jacking method used in developing city drainage systems.
Apart from the implementation method, students also received an explanation regarding the drilling material disposal route. Material produced from the drilling process is channeled through a pump system and then processed so as not to cause pollution at the project site. In this project, PT Tohoma Mandiri uses environmentally friendly drilling materials and applies a separation plant system to separate the drilling material.
This system ensures that the material can be recycled and reused. With this visit, PT Tohoma Mandiri supporting the development of practical knowledge for the younger generation who will be involved in the world of engineering and the environment.
IKK Toba Pipeline and SPAM Building Development Project by PT Tohoma Mandiri The construction of
ITB Student Visit to the Location of Jakarta Sewerage Development Project Students from the Bandung
The Role of Hydraulic Jacks in Microtunneling Projects for Success and Efficiency Hydraulic Jack functions
© 2023 Tohoma | All Rights Reserved