20,000m3 DC Cilincing GFST Reservoir Tank Work at SPAM Regional Jatiluhur I DKI Jakarta by PT Tohoma Mandiri
20,000m3 DC Cilincing GFST Reservoir Tank Work at SPAM Regional Jatiluhur I DKI Jakarta by
PT Tohoma Mandiri - Assembling Innovation
Jakarta Sewerage Development Project (JDSP) Zone 1 Package 2 officially starts with an opening ceremony held at Jalan Sutan Syahrir no 16, Project JSS pit C.1.1. Attended by a number of agencies such as the PUPR Service, Kumagai Wika Jakon, and several project consultants.
Representative of the Ministry of Public Works and Public Housing (PUPR), Aini, said that this project is a positive step in developing infrastructure with efficient microtunneling technology, which is expected to improve the drainage and sanitation system in Jakarta and provide long-term benefits.
PT Tohoma Mandiri is trusted with Kumagai Wika Jakon to carry out a microtunneling project in 2 packages with a span length of 8.2 kilometers. The work began with the first span in pit C.1.1 with a length of 90 meters. The event was closed with an accompaniment of hope and prayer that this project can run well for optimal results.
20,000m3 DC Cilincing GFST Reservoir Tank Work at SPAM Regional Jatiluhur I DKI Jakarta by
Jacking Auger Work by PT Tohoma Mandiri on the Waste Water Treatment Plant Project in
PT Tohoma Mandiri 20,000m3 GFST Reservoir Tank at the DKI Jakarta Jatiluhur Regional SPAM Project
© 2023 Tohoma | All Rights Reserved