Hold Fire Management Training to Improve Work Safety on Projects
Hold Fire Management Training to Improve Work Safety on Projects PT Tohoma Mandiri once again
PT Tohoma Mandiri - Assembling Innovation
PT Tohoma Mandiri succeeded in making a breakthrough from PIT 2 to PIT 1 with a depth of around 7 meters and a span length of 120 meters in the installation of DN1000MM RCP Pipe in the DKI Jakarta Province POLDER/Retention Pool Development Project, precisely on JL. TB. Simatupang, South Jakarta (Front of ANTAM Building).
The Polder and Retention Pond System is an effective strategy in dealing with flood risks by limiting vulnerable areas, controlling the volume of water, and using retention ponds as temporary containers to manage rainwater and seep it into the ground. One innovative technology that can overcome flooding is PT Tohoma Mandiri’s Microtunneling.
By prioritizing occupational health and safety during the construction process, we remain committed to playing an active role in developing innovative solutions for a sustainable environment in the future.
Hold Fire Management Training to Improve Work Safety on Projects PT Tohoma Mandiri once again
GFST Reservoir Tank Vol. 300m3 by PT Tohoma Mandiri at SPAM Lotu, North Nias Regency
Why is it Necessary to Implement K3 in Construction Projects? In every construction project, workers
© 2023 Tohoma | All Rights Reserved