EIA Installation and Service Project for TCCA & H202 by PT Tohoma Mandiri
EIA Installation and Service Project for TCCA & H202 by PT Tohoma Mandiri PT Tohoma
PT Tohoma Mandiri - Assembling Innovation
Students from the Bandung Institute of Technology (ITB) visited the Sewerage Development Project site which is currently being carried out by PT Tohoma Mandiri. This visit aims to provide direct insight into the Microtunneling jacking method used in developing city drainage systems.
Apart from the implementation method, students also received an explanation regarding the drilling material disposal route. Material produced from the drilling process is channeled through a pump system and then processed so as not to cause pollution at the project site. In this project, PT Tohoma Mandiri uses environmentally friendly drilling materials and applies a separation plant system to separate the drilling material.
This system ensures that the material can be recycled and reused. With this visit, PT Tohoma Mandiri supporting the development of practical knowledge for the younger generation who will be involved in the world of engineering and the environment.
EIA Installation and Service Project for TCCA & H202 by PT Tohoma Mandiri PT Tohoma
Breakthrough on the IPAL Piping Project Zone 1&3 KIPP IKN East Kalimantan by PT Tohoma
Hold Fire Management Training to Improve Work Safety on Projects PT Tohoma Mandiri once again
© 2023 Tohoma | All Rights Reserved