Hold Fire Management Training to Improve Work Safety on Projects
Hold Fire Management Training to Improve Work Safety on Projects PT Tohoma Mandiri once again
PT Tohoma Mandiri - Assembling Innovation
Students from the Bandung Institute of Technology (ITB) visited the Sewerage Development Project site which is currently being carried out by PT Tohoma Mandiri. This visit aims to provide direct insight into the Microtunneling jacking method used in developing city drainage systems.
Apart from the implementation method, students also received an explanation regarding the drilling material disposal route. Material produced from the drilling process is channeled through a pump system and then processed so as not to cause pollution at the project site. In this project, PT Tohoma Mandiri uses environmentally friendly drilling materials and applies a separation plant system to separate the drilling material.
This system ensures that the material can be recycled and reused. With this visit, PT Tohoma Mandiri supporting the development of practical knowledge for the younger generation who will be involved in the world of engineering and the environment.
Hold Fire Management Training to Improve Work Safety on Projects PT Tohoma Mandiri once again
GFST Reservoir Tank Vol. 300m3 by PT Tohoma Mandiri at SPAM Lotu, North Nias Regency
Why is it Necessary to Implement K3 in Construction Projects? In every construction project, workers
© 2023 Tohoma | All Rights Reserved